大东沟矿区千枚岩易斜地层钻探工艺研究

Research on Drilling Technology of Inclined Strata in a Mining Area

  • 摘要: 在钻探施工中,孔斜会导致获取的岩心资料不准确,情况严重时会引起孔内事故。导致孔斜的因素主要包括地质(地层、岩性等)与工程(设备、工艺)两个方面,从施工参数(转速、压力和流量)和设备操作入手,通过分析钻头与岩石作用机理,分析影响钻孔偏斜的施工参数。以立轴钻机和履带式全液压钻机在某矿区施工为例,认为在钻进软硬互层等易斜地层时,采用适合硬地层的转速,适当控制钻进速度,钻进参数为转速300~400 r/min,钻机仪表压力500~800 kg,泥浆泵冲洗液流量65~90 L/min,进尺恒速钻进控制在15 cm/10 min,可有效控制钻孔偏斜,同时提高施工效率。

     

    Abstract: During the drilling process, if the borehole is inclined, the obtained core data will be inaccurate, and in severe cases, it may even cause accidents inside the borehole. The factors causing borehole inclination mainly include geological (strata, rock properties, etc.) and engineering (equipment, technology) aspects. Starting from the construction parameters (rotation speed, pressure and flow rate) and equipment operation, by analyzing the interaction mechanism between the drill bit and the rock, the construction parameters that affect the borehole deviation are analyzed. Taking the construction of a certain mining area using a vertical shaft drilling rig and a crawler−type fully hydraulic drilling rig as an example, it is believed that when drilling in soft−hard interbedded layers and other inclined formations, using a rotation speed suitable for hard formations, appropriately controlling the drilling speed, and selecting the drilling parameters as follows: rotation speed 300−400 r/min, pressure 500−800 kg, flushing fluid flow rate 65−90 L/min, constant−speed drilling of the advance distance controlled at 15 cm/10 min, can effectively control the borehole deviation and simultaneously improve the construction efficiency.

     

/

返回文章
返回